Fire Safety Analysis Manual

Fire Safety Analysis Manual

Adding a Tank? Start the Fire Safety Analysis First.

A plant expansion can stall at the permit desk. NFPA 58 (§6.30 in the 2024 edition; your state's adopted edition governs) calls for a Fire Safety Analysis once an installation holds more than 4,000 gallons of aggregate water capacity, and it gets updated when storage or transfer changes. Plan on four to six weeks, end to end.

We do it for you. Send us the site facts: where the tanks sit, their water capacity, a site sketch. We write the analysis. Your local fire authority reviews it, not us.

Ask for the intake form   Or call 610-228-0887 and ask for Bill.

The pad is poured, the tank is on its way, and the fire marshal asks for a Fire Safety Analysis nobody started.

Fire Safety Analysis, why you need it. Who needs it: bulk plants, industrial plants and dispensing systems over 4,000 gallons of aggregate water capacity at one installation. The rule: NFPA 58 section 6.30 in the 2024 edition; it goes to your local fire authority and emergency responders, and is updated when storage or transfer changes. What they ask to see: your fire marshal asks for it, adding a tank brings it up, and your local fire authority reviews it. Without it: a plant expansion can stall at the permit desk; plan on four to six weeks, end to end. A template and a starting point, not legal advice.
Open the full-size chart

Ask for the intake form

Listen in the truck: six written plans, under 10 minutes. For each one: who needs it, the rule behind it by section, and what it costs you to go without.

The fire safety analysis starts at 7:16.

What It Takes

Every site is different, so the work is sized to yours: how many tanks, their water capacity, and what's changing. Send us the site facts and Bill calls you back about your site.

Your part of the calendar: a sit-down with your fire chief and a call to your water utility.

Ask for the intake form

Or call 610-228-0887 and ask for Bill.

Why Operators Use Us

policies-and-procedures

Built by an operator. Bill Stomp — 25-year propane operator, combat veteran, who has since helped 200+ propane companies.

Cited, section by section. The analysis follows NFPA 58 (§6.30.3 in the 2024 edition) and names the edition your state adopted.

Your fire authority has the last word. We write the analysis for your installation. Your local fire authority and emergency responders review it.

Kept current. Tell us when storage or transfer is changing, and we'll flag that the analysis is due.

Ask for the intake form

Straight answers

What is the Fire Safety Analysis Manual?
The written plant file for fire risk at bulk LP-gas storage — a book you can hand to an inspector or the local fire chief. It is not a policies manual and not a DOT security plan.

Who needs one?
This site cites a commonly used trigger: total ASME container capacity above 4,000 gallons, and states vary. Confirm the current code text your state has adopted, and ask your local AHJ, before you treat that figure as settled.

Can software write it from a click?
No self-serve app on this site writes a finished fire safety analysis from a click. The deliverable is a written analysis built to your plant.

More: What is a propane fire safety analysis?