What Written Plans Does a Propane Company Need? West Virginia Guide

West Virginia's State Fire Code, effective July 1, 2026, adopts NFPA 1, 2021 edition, and requires PERC training standards for most people who install or maintain LP-gas systems. Those facts do not settle federal transportation duties. Propane Safety Pro (PSP), a manual-writing service, turns your operating information into manuals that keep facility, people and transport questions separate.

Which written item answers which question
Written itemWhat to check
Company policies and proceduresWho follows and maintains company procedures?
Facility operating and maintenance proceduresDo the cited rules apply to this facility and work?
DOT security planDo the federal material, quantity and transport conditions apply?

Which West Virginia rules and sources should we consult?

The State Fire Commission writes the State Fire Code, which must include safe practices for the design, construction, location, installation, maintenance and operation of LP-gas systems, plus training standards for the people who install or maintain them. Since July 1, 2020, fire-code enforcement rests solely with the Office of the State Fire Marshal. Sources: W. Va. Code §15A-11-3 and §15A-10-2(g), read November 9, 2026.

The Fire Code rule, 87 CSR 1, filed May 13, 2026 and effective July 1, 2026, adopts NFPA 1, 2021 edition, and incorporates the codes and standards that NFPA 1 references. The rule prints no NFPA 58 edition year, so confirm the edition with the State Fire Marshal before a manual names one. Source: 87 CSR 1, §87-1-2, read November 9, 2026.

No one may use, refill or work on an LP-gas container without the tank owner's consent, or sell, install, fill or deliver a container unless they own it or the owner authorizes its use. Source: W. Va. Code §15A-10-15, read November 9, 2026.

When does a DOT security plan apply under 49 CFR 172.800?

Transportation requires a separate federal applicability check. The security-plan rule considers the material, quantity and transport activity; large bulk quantities of Division 2.1 material are one listed category. The definitions and exceptions matter, so a fire-code training rule and vehicle capacity alone cannot settle the question. Source: 49 CFR §172.800, read November 9, 2026.

A covered plan addresses risk assessment, personnel security, unauthorized access and en route security, with at least annual review and updates when circumstances change. Source: 49 CFR §172.802, read November 9, 2026. Use the national DOT Hazmat Security Plan page for that distinct book.

Which company procedures keep the records separate?

A West Virginia manual should name who confirms tank ownership or the owner's consent before a fill, and who keeps each installer's training proof. As a practical filing choice, keep tank-consent records apart from employee records, then connect both to the procedures that use them. This is advice for making the file useful, not an extra fire-code retention rule.

Our Policies & Procedures manual puts the company's way of working into writing. It does not replace PERC training or the State Fire Marshal's review.

How do PEP and CETP relate to training in West Virginia?

This site has no West Virginia training answer yet; see the state training guides. The Fire Code requires any person who installs or maintains LP-gas systems to complete training standards and qualifications established by the Propane Education and Research Council (PERC) Training Program, except a person who installs, fuels, maintains or services a fuel gas system on a single-family dwelling that person owns or leases and occupies. Source: 87 CSR 1, §87-1-15.1, read November 9, 2026.

CETP means Certified Employee Training Program; PEP means PERC Education Program. PERC's move to job-based paths is a program description, not a ruling on West Virginia qualifications. Source: PERC FAQ, read November 8, 2026. Meet Safety Pro lists trainers; the separate DOT training page concerns federal training records.

Which facility operating and maintenance procedures apply?

Use the facility's equipment and applicable adopted rules as the basis for its procedures. Our Operations & Maintenance manual is the facility book, distinct from the company policy manual. The owner or occupant of a new building, an existing industrial or storage occupancy, or a building with half or more of its space renovated obtains a certificate of occupancy before use; record which applies to each facility. Source: 87 CSR 1, §87-1-2.1.4.a, read November 9, 2026. This guide does not decide every facility's O&M obligations.

How does a written manual relate to truck and field records?

A hazardous materials permit answers a different question from who documented a delivery check. The Propane Safety App supports plant, tank and cathodic-protection records, plus training notifications. Capture tools include photos, location, dates and signatures. The office still checks findings and assigns repair follow-up. Full Tank Spotter adds service scheduling and work orders; those service functions belong to the broader product. Used with written procedures, the records help you show inspectors documented, dated work. The national Safety App page explains the wider workflow.

How can we request the written books for our operation?

A company rulebook, an applicable DOT security plan and the facility O&M book cover different parts of the operation. Bill or Kay can provide one written quote for the books that fit your work. Ask Bill or Kay for a written quote.

What else should a West Virginia propane company ask?

Which NFPA edition does West Virginia adopt? NFPA 1, 2021 edition, with the codes it references, in a rule effective July 1, 2026. The rule prints no NFPA 58 year. Source: 87 CSR 1, §87-1-2, read November 9, 2026.

Who does fire inspections at West Virginia propane sites? The State Fire Marshal's Fire Safety Inspection Division conducts fire and life safety inspections in all occupancies except one and two family dwellings. Source: State Fire Marshal inspections page, read November 9, 2026.

Can a West Virginia training rule replace the federal security-plan check? No. Apply the federal material, quantity and transport conditions separately. Source: §172.800, read November 9, 2026.

Do West Virginia hazmat vehicles need a state permit? A motor vehicle transporting hazardous materials on West Virginia highways must first comply with the Public Service Commission's registration and permitting program. Sources: W. Va. Code §24A-6B-1 and §24A-1-2, read November 9, 2026.

Who wrote this guide, and which sources support it?

Official links and read dates appear beside the relevant claims. Read dates are not effective dates; confirm current requirements with the authority for the location and duties.

Written by: Bill Stomp — 25-year propane operator, combat veteran, who has since helped 200+ propane companies.

Last updated:

General information, not legal advice. A manual supports procedures; purchase alone does not establish training, implementation or compliance.