The cylinder on your fill rack, the storage tank in the yard and the cargo tank on your bobtail do not share one requalification schedule. Identify the container from its markings before choosing a rule. Cylinder intervals depend on specification and requalification method; stationary tanks follow their applicable inspection rules; cargo tanks have a separate federal testing program.
Identify the container before choosing a date
Read the cylinder markings or tank nameplate and confirm the equipment’s use. Shape and color will not tell you. The markings and nameplate will. If the identification is missing or unclear, ask a qualified equipment specialist before assigning a schedule.
| Container | Rule to check | How to choose the schedule |
|---|---|---|
| Portable cylinder | 49 CFR 180.209 for DOT specification cylinders | Use the current table, its notes and applicable paragraphs for the cylinder’s specification and permitted requalification method. A special-permit cylinder also requires its permit conditions. |
| Stationary storage tank | The adopted NFPA 58 edition and the authority having jurisdiction for a stationary ASME propane tank | These tanks have no federal cylinder requalification date under 49 CFR 180.209. Confirm the applicable inspection and maintenance requirements locally; that distinction does not remove inspection duties. |
| Truck cargo tank | 49 CFR 180.407 for specification cargo tanks | Check the tank specification, service and applicable test or inspection type. Use that section’s conditions and exceptions, rather than a cylinder interval. |
For the written cylinder procedure, see the cylinder requalification manual scope.
Use the current cylinder table
There is no single propane-cylinder retest interval. Have the authorized requalifier match the specification and markings to the current 49 CFR 180.209 table and applicable provisions. Record the method as well as the date. Do not copy a cylinder interval onto a stationary storage tank or a bobtail. A cylinder overdue for requalification may not be filled and offered for transportation, so the date has to be right before it reaches the fill rack.
Keep the three equipment files separate
- Cylinders: the written cylinder procedure and each cylinder's requalification date and method.
- Stationary ASME tanks: the inspections your adopted NFPA 58 edition and local authority require.
- Truck cargo tanks: the 49 CFR 180.407 tests and inspections.
safety manuals · equipment file checklist
For the distinct records programs, read records kept by cylinder requalifiers and bobtail cargo-tank tests and inspections. For stationary equipment, confirm the adopted code with the local authority.
Choose the written procedure for your shop
Propane Safety Pro was built by a propane operator who ran 87 branch offices across 12 states. Our cylinder requalification procedure covers the shop’s written accept, reject and send-out process. It is a template for the cylinder work, including a shop that sends cylinders to an authorized requalifier. It is not a stationary-tank inspection program, a cargo-tank testing program or an authorization to requalify cylinders.
Get the cylinder procedure written
Tell us which cylinders you fill and where you send them out. We set you up with the written accept, reject and send-out procedure for your fill rack. Or call 610-228-0887. A manual does not replace equipment inspection, employee training or regulatory approval.
Sources
Common questions
Do all propane containers have the same retest date?
No. Identify whether the container is a DOT cylinder, a stationary ASME tank or a cargo tank. Use the rule for that container and its service.
Do stationary storage tanks have a federal cylinder requalification date?
Stationary ASME propane tanks do not have the federal cylinder requalification date in 49 CFR 180.209. Inspection requirements depend on the adopted NFPA 58 edition, the authority having jurisdiction and other applicable rules.
We do not hold a requalifier number. Does a written procedure still matter?
Yes, if you fill DOT cylinders. Before each filling, the filler must inspect the outside of the cylinder, and a cylinder overdue for requalification may not be filled and offered for transportation (49 CFR 173.301(a)(2) and (a)(6)). A written accept, reject and send-out routine helps the person at the fill rack catch it before it is filled.
Does buying the cylinder procedure authorize requalification?
No. The written procedure is a template. It does not provide PHMSA approval or a requalifier identification number, and it does not establish compliance.
Get the cylinder procedure written
Or call 610-228-0887.